Skip to content
ACS Klima
Custom Air Handling Unit Manufacturer
Home
Corporate
Mission & Vision
Quality Management
Awards
Products
Air Handling Unit
AHU General Features
Fresh Air Handling Unit
Hygienic Air Handling Unit
Packaged Hygienic AHU
AHU With Heat Recovery
Pool Dehumidification Unit
Packaged Rooftop Unit
Condensing Unit
Heat Recovery Ventilation Unit
Energy Recovery Ventilation Unit
Fan Coil Unit
Ecology Unit
Water Source Heat Pump
Exhaust Unit
Solutions
Hospitality
Healthcare
Pharmaceutical
Business
Food and Beverage
Commercial
References
by Category
Hotel
Hospital
Pharmaceutical
Commercial
Educational
Entertainment Venues
Food and Beverage
Special Facilities
by Location
United Arab Emirates
Qatar
Russia
Malta
Pakistan
Turkey
Romania
Cyprus
Support
Blog
News
HVAC Glossary
HVAC Tips
HVAC Innovations
Sustainable HVAC
Contact
Türkçe
Home
Corporate
Mission & Vision
Quality Management
Awards
Products
Air Handling Unit
AHU General Features
Fresh Air Handling Unit
Hygienic Air Handling Unit
Packaged Hygienic AHU
AHU With Heat Recovery
Pool Dehumidification Unit
Packaged Rooftop Unit
Condensing Unit
Heat Recovery Ventilation Unit
Energy Recovery Ventilation Unit
Fan Coil Unit
Ecology Unit
Water Source Heat Pump
Exhaust Unit
Solutions
Hospitality
Healthcare
Pharmaceutical
Business
Food and Beverage
Commercial
References
by Category
Hotel
Hospital
Pharmaceutical
Commercial
Educational
Entertainment Venues
Food and Beverage
Special Facilities
by Location
United Arab Emirates
Qatar
Russia
Malta
Pakistan
Turkey
Romania
Cyprus
Support
Blog
News
HVAC Glossary
HVAC Tips
HVAC Innovations
Sustainable HVAC
Contact
Türkçe
Start up form of Pool Dehumidfying Unit
You are here:
Home
Start up form of Pool…
Comments
This field is for validation purposes and should be left unchanged.
Company Name
(Required)
Contact Person
(Required)
Phone
(Required)
Email
(Required)
Country / City
(Required)
Device Serial Number
(Required)
Preferred start date
(Required)
Dear Project Officer; In order for your product to start up in a timely and healthy manner, please check the “Yes” or “No” boxes by examining the questions below. Make sure to review the assembly diagram in the user and assembly manual or which you will request from ACS. If this form is not delivered to ACS Technical Service at least 7 working days before your start up date, the start up process does not start. When our team arrives at your worksite, if the start up conditions are not ready or missing, the process of start up for the second time will be made with a fee. If you need extra information about this form or your device, ACS will gladly support you. Best wishes for a successful business together.
If the products replaced in the spots in the project
Yes
No
If the connection of the air handling unit cells in such a way that they are balanced on a very smooth surface and that air is not leaked
Yes
No
If all the wiring(and all related cableworks) have to be completed as per manufacturer’s technical specifications
Yes
No
Heating and Cooling Coils must be equipped with three way valves and servo motors. And water supply must be started
Yes
No
Cleaning of units must have been done (Scraps and deposits accumulated during construction)
Yes
No
If there are VAV units and if it is requested connection of these to BMS all electric wiring must have beeen done untill automation control board.
Yes
No
If there is duct type electric heater , proper cable must have been installed between electric Resistance and AHU automation control panel.
Yes
No
If there are VAV or electric heater in ceiling ,proper service door (min 60×60 cm) must have been installed on the ceiling .
Yes
No
Drain water and siphon connections must be done
Yes
No
All staff who will be trined for use of the units must be ready
Yes
No
Note: Additional training will be under extra fee
Distance between the condenser unit and the product
Details
Δ
Go to Top